Fipeing is fast.

There are only four steps to follow in processing a successful FIPE connection. Prepare the pipe and insert the fitting. Attach the press tool and swage the connection via remote control. Finally, check the quality of the connection visually.

  • Prepare

  • Insert

  • Press

  • Check

Installation time

Fipeing vs. welding